Joe Long Leadership Scholarship
For UW-Superior students who have shown outstanding leadership, meet a minimum GPA, and show financial need; it is awarded for the following academic year.
Joe Long Leadership Scholarship is a scholarship at University of Wisconsin-Superior. Applications are due March 1, 2027.
- Award
- Not stated
- Deadline
- March 1, 2027
- Offered by
- University of Wisconsin-Superior
- Minimum GPA
- 2.25
- Financial need
- Required
- Looks for
- Leadership and study abroad
- Last checked
- November 25, 2026
- Application needs
- An application form
- Repeats
- The same deadline comes round every year
Who can apply
- Requires a GPA of at least 2.25.
- Financial need is required.
- Awarded on merit.
In the listing’s own words
Required
- For students who have shown outstanding leadership, who have a minimum GPA of 2.25
- who have a minimum GPA of 2.25
- who show financial need
Common questions
When is the Joe Long Leadership Scholarship deadline?
The deadline is March 1, 2027.
Who can apply for the Joe Long Leadership Scholarship?
Requires a GPA of at least 2.25. Financial need is required. Awarded on merit.
What does the application need?
It asks for an application form.
How do I apply for the Joe Long Leadership Scholarship?
Apply through the official page at University of Wisconsin-Superior; the link is on this page. This site never handles applications.
Details come from the school’s website, last checked November 25, 2026. Always confirm the amount, deadline and rules on the official page before you apply.
Official page: https://uwsuper.edu/scholarships/joe-long-leadership-scholarship/
The same details as data: https://goldenscholarship.com/api/scholarships?id=a184d39022f98be5&school=240426
More scholarships at University of Wisconsin-Superior
- Agnes Dahl Memorial Scholarshipdue March 1, 2027
- Carlton W. Smith Scholarshipdue March 1, 2027
- Eugenia Dorman Davidson Vocal Music Scholarshipdue March 1, 2027
- Art and Betty Amys Scholarshipdue March 1, 2027
- Andy Borg - VFW Scholarshipdue March 1, 2027
- Donald and Laura Carroll Scholarshipdue March 1, 2027
- Norton E. Croft Scholarshipdue March 1, 2027
- Barbie Thompson Scholarshipdue March 1, 2027
See every scholarship at University of Wisconsin-Superior, with filters